EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MaggieMaeOfKS
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (100)
Research
- (4)
-
Zenith Homecoming...
-
Corvair College #40
-
Bought Plans from...
-
Decided to Build an...
Workshop
- (6)
-
Moved into new shop
-
Packed Up and Moved Out
-
Moved Into Pleasant...
-
Moved Out of...
-
Moved to Lawrence
-
Workbenches
Empennage
- (1)
-
Bought Spruce Wood...
Fuselage
- (41)
-
Drilled holes for...
-
Painted Inner Cabane...
-
Bent Cabane Strut...
-
Painted Some Metal...
-
Steel Fittings
-
Finished...
-
Glove box
-
Seat Harnesses
-
Turtle Deck, Front...
-
Turtle Deck, Seat...
-
Turtle Deck
-
Trimmed Filler Strips
-
Added Filler Strips
-
Glued Gussets,...
-
Added Gussets
-
Added Gussets
-
Diagonal Braces
-
Cut One Steel Part,...
-
Steel Fittings
-
Drilled Holes in...
-
Laid Out Sheet Metal...
-
Glued Some Gussets
-
Gussets
-
Finished Seats
-
Front Seat
-
Rear Seat
-
Built Seat Bottoms
-
Trimmed Floor,...
-
Began Forming Tail...
-
Glued First Cross...
-
Set Up Fuselage Trusses
-
Added Gussets to...
-
Added Wedges, Made...
-
Dismantled Truss Jig
-
Second Fuselage Truss
-
Second Truss
-
Second Side Truss
-
Glued First Truss
-
Built Fuselage Jig
-
Cut Struts and Braces
-
Bought Wood for...
Firewall
Tail Feathers
Wings
- (1)
-
Metal fittings
Controls
- (2)
-
Welding
-
Cut control horns
Avionics
- (1)
-
Intercom
Lighting
Instrument Panel
Landing Gear
Engine
- (13)
-
Bought Spruce Wood...
-
Bought Distributor,...
-
Bought Engine Mount
-
Received Another...
-
Continued Cleaning...
-
Continued Cleaning...
-
Continued Cleaning...
-
Began Cleaning...
-
Continued Core...
-
Continued Core...
-
Continued Core...
-
Began Core Engine...
-
Bought First Core...
Propeller
Fuel System
- (29)
-
Painted Fuel Tank
-
Primed Fuel tank
-
Tested Fuel Tank...
-
Attached Fuel...
-
Sealed Rivets
-
Fuel Quantity Probe
-
Bondo On Outside of...
-
Assembled Fuel Tank
-
Vent Tubes, Probe...
-
Fuel Probe Mount
-
Made Gussets for...
-
Riveted Top of Tank
-
Steel Fittings, and...
-
Continued Fuel Tank
-
Fuel Tank
-
Started Top of Fuel...
-
Built Drain and...
-
Attached Flange...
-
Turned Tubes And...
-
Match Drilled Bottom...
-
Marked Rivet Hole...
-
Continued Fuel Tank
-
Continued Fuel Tank
-
Began Fuel Tank...
-
More Fuel Tank Parts...
-
More Parts Purchased
-
More Fuel Tank Parts
-
Fuel Tank Design
-
Fuel Tank Parts
Interior Finish
Paint / Decals
- (1)
-
Fuselage Side Art
Inspection
- (1)
-
Girls Checked Out...
Tools
Builder Name:
Bryce Gorrell
-
Project:
Pietenpol - Aircamper
-
VIEW REPORTS
Total Hours:
394.2
Total Flight Time:
Total Expense:
$7932.61
Start/Last Date:
Feb 01, 2017 - No Finish Date
Engine:
Bryce Gorrell, CorvAIR
Propeller:
Warp Drive
Friendly URL:
https://eaabuilderslog.org?s=MaggieMaeOfKS
Home or Last Project Picture
Sep 24, 2019
Dismantled Truss Jig
- (5 hours)
Category: Fuselage
I dismantled the fuselage truss jig and sanded the joints on one of the trusses to eliminate excess epoxy and return the joints to flatness to prep them for plywood gussets.
truss7.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.